New Cell Tower
For the past week or so, GCI has been running wire under the ground beside the road going toward Andrew’s Hill for a new cell tower. The Groomer’s scraped the snow off the bump over the Lekisch tunnel so the wire could be trenched in. The wire has now been installed and Craig has replaced the snow and it looks like nothing ever happened. Enjoy the trails and hopefully better cell service to come.